主頁
公司簡介
工程服務
工程產品
工程例子
獎項
聯絡我們
More
After individual slot number had been marked, test was conducted at each spot to find out the extent (perimeter) of defective concrete.
Treated spots were subsequently patched up with bonding and waterproofing mortar.