Project 4
FLOOR RENOVATION
Before Work (Problems):
1. Existing coating peeled off. 2. Part of finish/screed cracked and delaminated. 3. Existing surface not non-slip.
Work Process 7
Repaint floor with white line markings.
1/9
1. Existing coating peeled off. 2. Part of finish/screed cracked and delaminated. 3. Existing surface not non-slip.
Repaint floor with white line markings.