工程項目 1
混凝土維修
Concrete Repair Works
After individual slot number had been marked, test was conducted at each spot to find out the extent (perimeter) of defective concrete.
Concrete Repair Works
Treated spots were subsequently patched up with bonding and waterproofing mortar.
1/7